Reference
Arena Mineirão - 2014 FIFA World Cup stadium
Market
HVAC
Sector
Other non residential buildings
Country
Brazil
ISOVER contributed to the renovation of one of the sport stadiums hosting the 2014 FIFA World Cup
The renovation of the Arena Mineirão stadium began in August 2012 for a period of 4 months. CLIMAVER was choosen to achieve the sustainability objectives of the building, which is indeed LEED certified. The environmental aspects of the CLIMAVER product made the difference with the competition. The technical support during the work and the partnership with the installer were also critical points to attend the schedule.
Discover CLIMAVER, the best solution for your HVAC insulation
Contributing to the renovation of the FIFA World Cup's stadium