References
- Cars (3)
- Service Stations (1)
- Chemical (3)
- Cruise ships (15)
- Culture (7)
- Education (5)
- Energy Intensive Processes (5)
- Fishing ships (2)
- Food & Beverage (3)
- Healthcare (5)
- Hotel (6)
- LNG (2)
- Luxury yatchs (1)
- Military ships (1)
- Office buildings (17)
- Offshore (5)
- Other (13)
- Petrochemical & Refining (16)
- Police patrol vessels (3)
- Power generation (36)
- Public buildings (11)
- Residential (4)
- RoRo / Ferry (14)
- Sport & leisure (4)
- Warehouses and industrial buildings (1)
- Argentina (3)
- United Arab Emirates (1)
- Saudi Arabia (1)
- Austria (1)
- Belgium (2)
- Brazil (3)
- Bulgaria (2)
- Canada (2)
- China (5)
- Colombia (14)
- Croatia (13)
- Czech Republic (8)
- Finland (8)
- France (7)
- Germany (29)
- Italy (1)
- Japan (1)
- Korea (3)
- Lithuania (1)
- Malta (1)
- Netherlands (7)
- Norway (1)
- Philippines (1)
- Portugal (1)
- Romania (3)
- Russian Federation (13)
- Rwanda (1)
- Slovakia (1)
- Spain (35)
- Sweden (1)
- Switzerland (3)
- Togo (1)
- United Kingdom (5)
- United States of America (3)
- Uruguay (2)
Viking Line Ferry
Isover provided its ultimate® insulation solutions for a 139 m ferry able to accommodate 1500 passengers on board. Isover spain worked directly with the astilleros de sevilla- sevilla shipyard in order to find the lightest solution. The viking line ferry company signed a contract with the spanish shipyard astilleros de sevilla for a newly built ferry to be delivered by the summer of 2009.
VOSHOL - WOT
Energy saving agricultural storage tank. Discover the isover tech solution to optimise your industry insulation.
Wangjing SOHO
The products of ISOVER are mainly applied in HVAC system of tower 1 and 3 with the total volume of about 40 000 m². The project has 20 000 m² CLIMAVER NETO duct board for return air section and 20 000 m² of HVAC External Thermal Insulation Glass Wool (48K30 with aluminium facing) for exhaust duct. Discover CLIMAVER, the best solution for your HVAC insulation.
WANNER - ECOLAIRE ESPAÑA
Alpetrol tanks insulation. The project consisted in the construction of several fuel storage tanks with the total capacity of 403.000 m3.
WANNER - PLANTA TERMOSOLAR EXTREMADURA
Salt tanks insulation : the project consisted in the construction of a new concentrated solar plant of 50 mw , including solar field, power island and 2 salt tanks.
WANNER - SCHWARTZ
Modular project : the project consisted in increasing the capacity of refinery. The project included one new solvent deasphalting unit (SDA), a new mild hydrocracker fractionation section.
Wiko - Argos
Huge tank project in Rotterdam. Storage tanks. Discover the ISOVER solutions to optimise your industry insulation.
Windpark Tender
Built by the small ship and SWATH specialist Abeking & Rasmussen in Lemwerder, the 26.4m loa and 13m wide tender, which draws 2.7m, was named after BARD Holding managing director Natalia Bekker, who died last year. Turbine installation has just begun, with 80 being installed up to the middle of next year using the new, purpose built platform barge Wind Lift 1.
World Trade Center 7 in New-York
The new 7 World Trade Center in New York City towers at a majestic 52 stories (741 feet) high and covers a staggering 1.7 million square-feet of floor space. The prime focus at the new World Trade Center 7 is occupant safety, durability, and the use of environmentally friendly materials. To improve the air distribution efficiency and minimize air conditioning leaks, CertainTeed® SoftTouch™ Duct Wrap insulating materials have been selected for the external insulation of the building’s heating, ventilation and air conditioning ducts.
ZAGREB - HOLDING
Tanks for mud storage and extracting methan. Biological wastewater treatment plant. Discover the ISOVER TECH solution to optimise your industry insulation.
Zhong Rong Jasper Tower
Lying in the center of Lujiazui Finance & Trade Zone, Pudong District, Shanghai, ZhongRong Jasper Tower extends 4 levels downwards underground and 43 levels upwards aboveground to a height of 220 m with a total construction area of nearly 100,000 m². It is an international 5A first class financial and commercial office building of modernization, intelligentialize and multifunction. The building was rated as one of China's Top 10 Landmark Buildings.
- First page
- Previous page
- …
- Page 4
- Page 5
- Page 6
- Page 7
- Page 8 of 16
- Current page 8
- Page 9
- Page 10
- Page 11
- Page 12
- …
- Next page
- Last page