ISOVER contributed to the renovation of one the sport stadium hosting the 2014 FIFA World Cup.
The renovation of the stadium began in August 2012 for a period of 4 months. CLIMAVER was choosen to achieve the sustainability objectives of the building, which is indeed LEED certified. The environmental aspects of the CLIMAVER product made the difference with the competition. The technical support during the work and the partnership with the installer were also critical points to attend the schedule.


Discover CLIMAVER, the best solution for your HVAC insulation