References

167 results
Image

Allianz Arena in Munich

Built for the 2006 FIFA World Cup, the Allianz Arena in Germany accommodates 66,000 visitors.

50,000 m² of ULTIMATE® mineral wool produced by Saint-Gobain ISOVER G+H was used for the construction of this impressive stadium.

HVAC
Image

Arena Corinthians

The construction of the new sport stadium started in October 2012, and lasted 18 months. The main reasons which lead the client to choose CLIMAVER were the short construction schedule and the great concern to maintain it, as well as the speed of assembly and the lightness of the product.

HVAC
Image

Arena Mineirão

The renovation of the stadium began in August 2012 for a period of 4 months. CLIMAVER was choosen to achieve the sustainability objectives of the building, which is indeed LEED certified.

HVAC
Image

ARME - GYPROC

IMPROVING ENERGY EFFICIENCY OF BALL MILL OWEN.

Industry
Image

ARRAS COGENERATION PLANT

Insulation of a new a cogeneration plant for the urban population of Arras, Hauts-de-France.

Industry
Image

Atlantis swimming pool in Annaberg-Buchholz

ISOVER provides STI with customized ULTIMATE® EasyRoll products. Dimensions have been adapted to the special needs and request of STI for the panels to fit exactly within their collectors.

Thermal Solar Collectors
Image

Barajas Airport in Madrid

This new airport terminal building reflects Madrid's commitment to becoming a major international hub.

HVAC
Image

Bashneft-Ufaneftekhim

Products used : ISOTEC МП(ХНС)-100 GOST 21880-2011  

Benefits : Stone wool - High service temperatures / Standard thermal insulation

Industry
Image

Belgrano Office Tower

This new built 31 floors skyscraper has a total height of 130 meters. It is achieving very high performances in terms of environmental protection, since it is LEED certified in the gold category.

HVAC
Image

Bella Desgagnes

Bella Desgagnes is a huge passenger container vessel with a length of 95m. Outside the high weight reduction they allow, ULTIMATE® products have excellent thermal, acoustic and fire-retarding features (fire protection better than A 60).

Marine and Offshore