References
- Cars (3)
- Service Stations (1)
- Chemical (3)
- Cruise ships (15)
- Culture (7)
- Education (5)
- Energy Intensive Processes (5)
- Fishing ships (2)
- Food & Beverage (3)
- Healthcare (5)
- Hotel (6)
- LNG (2)
- Luxury yatchs (1)
- Military ships (1)
- Office buildings (17)
- Offshore (5)
- Other (13)
- Petrochemical & Refining (16)
- Police patrol vessels (3)
- Power generation (36)
- Public buildings (11)
- Residential (4)
- RoRo / Ferry (14)
- Sport & leisure (4)
- Warehouses and industrial buildings (1)
- Argentina (3)
- United Arab Emirates (1)
- Saudi Arabia (1)
- Austria (1)
- Belgium (2)
- Brazil (3)
- Bulgaria (2)
- Canada (2)
- China (5)
- Colombia (14)
- Croatia (13)
- Czech Republic (8)
- Finland (8)
- France (7)
- Germany (29)
- Italy (1)
- Japan (1)
- Korea (3)
- Lithuania (1)
- Malta (1)
- Netherlands (7)
- Norway (1)
- Philippines (1)
- Portugal (1)
- Romania (3)
- Russian Federation (13)
- Rwanda (1)
- Slovakia (1)
- Spain (35)
- Sweden (1)
- Switzerland (3)
- Togo (1)
- United Kingdom (5)
- United States of America (3)
- Uruguay (2)
Aceites y grasas del Catatumbo
ESP insulation replacement in a vegetable oil and grease plant for biofuel and food industry. The previous insulation was presenting CUI.
AISLATER - Manuelita
Substitution of the low quality insulation previously installed with thermal efficiency improvement of 25%.
AC Technologies - Veolia Energie
CUTTING DOWN EMISSIONS OF NOX AND BUILDING OF DESULPHURISATION UNIT INCL. CLOTH FILTER. DESULPHURISATION OF BOILER K14 AT HEATING PLANT TŘEBOVICE
75–M–RoPax ferry
The client needed a light weight solution, and additionally a high fire protection in steel and aluminium. ISOVER enabled a high reduction of weight and the decrease of operating costs.
Bashneft-Ufaneftekhim
Products used : ISOTEC МП(ХНС)-100 GOST 21880-2011
Benefits : Stone wool - High service temperatures / Standard thermal insulation
Atlantis swimming pool in Annaberg-Buchholz
ISOVER provides STI with customized ULTIMATE® EasyRoll products. Dimensions have been adapted to the special needs and request of STI for the panels to fit exactly within their collectors.
Barajas Airport in Madrid
This new airport terminal building reflects Madrid's commitment to becoming a major international hub.
Arena Mineirão
The renovation of the stadium began in August 2012 for a period of 4 months. CLIMAVER was choosen to achieve the sustainability objectives of the building, which is indeed LEED certified.
Avenida de Grecia Administrative Center
ISOVER insulated an administrative office in Sevilla: the building, in a "L" form, is hosting more than 1500 jobs.
Arena Corinthians
The construction of the new sport stadium started in October 2012, and lasted 18 months. The main reasons which lead the client to choose CLIMAVER were the short construction schedule and the great concern to maintain it, as well as the speed of assembly and the lightness of the product.
Allianz Arena in Munich
Built for the 2006 FIFA World Cup, the Allianz Arena in Germany accommodates 66,000 visitors.
50,000 m² of ULTIMATE® mineral wool produced by Saint-Gobain ISOVER G+H was used for the construction of this impressive stadium.
4 Torres in Madrid
Cuatro Torres Business Area (CTBA) (Spanish for Four Towers Business Area) is a business park located in the Paseo de la Castellana in Madrid (Spain), on the former Ciudad Deportiva of Real Madrid. The complex was formerly known as Madrid Arena. The area contains the tallest skyscrapers in Madrid and Spain (Torre Espacio, Torre de Cristal, Torre Sacyr Vallehermoso and Torre Caja Madrid). The construction of the buildings finished in 2008.
- First page
- Previous page
- …
- Page 8
- Page 9
- Page 10
- Page 11
- Page 12
- Page 13
- Page 14
- Page 15 of 16
- Current page 15
- Page 16
- Next page
- Last page