Atlantis swimming pool in Annaberg-Buchholz

ISOVER provides STI with customized ULTIMATE® EasyRoll products. Dimensions have been adapted to the special needs and request of STI for the panels to fit exactly within their collectors.

Thermal Solar Collectors
Image

Arena Mineirão

The renovation of the stadium began in August 2012 for a period of 4 months. CLIMAVER was choosen to achieve the sustainability objectives of the building, which is indeed LEED certified.

HVAC
Image

Arena Corinthians

The construction of the new sport stadium started in October 2012, and lasted 18 months. The main reasons which lead the client to choose CLIMAVER were the short construction schedule and the great concern to maintain it, as well as the speed of assembly and the lightness of the product.

HVAC
Image

Allianz Arena in Munich

Built for the 2006 FIFA World Cup, the Allianz Arena in Germany accommodates 66,000 visitors.

50,000 m² of ULTIMATE® mineral wool produced by Saint-Gobain ISOVER G+H was used for the construction of this impressive stadium.

HVAC