References

People in meeting
35 results
KAEFER_Thumbnail

KAEFER

Wired mat with double stain steel mesh is necessary to avoid deterioration of mineral wool due to rotatory movement.

Industry
Housing Illa del A Llum_Thumbnail

Housing Illa del A Llum

The bulding Housing Illa del A Llum is an ambitious project is a project that proposes a set of homes located on the corner of Avenida Faria to Selva de Mar.

hvac
Ecosolar in Madrid-Thumbnail

Ecosolar in Madrid

This project appeared when the collaboration between Elia-solar and the study RLA started. Sustainability, energy efficiency and the use of renewable energies were at the forefront of this construction project.

hvac
Abora Energy_Thumbnail

Abora Energy

Thermal solar collectors provide heat in a clean, sustainable, and economic way using the sun’s radiation. Adding the efficient insulation reduces thermal losses to optimise the energy efficiency of the panels. Let’s look at how U SOLAR insulation helped Abora Energy become more efficient.
 

Thermal Solar Collectors
BBVA La Vela building_Thumbnail

BBVA La Vela building

This office center is 93 meters high and was insulated with CLIMAVER NETO.

hvac
AHTS Anchor Tug Vessel_Thumbnail

AHTS Anchor Tug Vessel

The AHTS Anchor Tug Vessel was built at the Zamakona Shipyard in Bilbao. ISOVER provided insulation solutions for fire, thermal and acoustic applications of a 85 m anchor handling tug supply (AHTS) vessels in total.

Marine and Offshore
Barajas Airport in Madrid_Thumbnail

Barajas Airport in Madrid

This new airport terminal building reflects Madrid's commitment to becoming a major international hub.

hvac
4 Torres in Madrid

4 Torres in Madrid

Cuatro Torres Business Area (CTBA) (Spanish for Four Towers Business Area) is a business park located in the Paseo de la Castellana in Madrid (Spain), on the former Ciudad Deportiva of Real Madrid. The complex was formerly known as Madrid Arena. The area contains the tallest skyscrapers in Madrid and Spain (Torre Espacio, Torre de Cristal, Torre Sacyr Vallehermoso and Torre Caja Madrid). The construction of the buildings finished in 2008.

hvac
2 Seatruck Ferries_Thumbnail

2 Seatruck Ferries

They are 2008-2009 projects, with a length of 142 m, and a weight of 14.700 GT each.

Marine and Offshore